Where a roll ends and a new one is begun the two rolls should be overlapped by four inches.
Nail pattern for roofing felt.
The paper should then be nailed in or stapled every three to four inches across.
Overhang is not required.
It does not have to be perfect but you may need to realign the drip edge.
Roll out about 10 feet of felt and fasten with staples or roofing nails with plastic washer heads.
The wsu should overhang the drip edge by 1 2 inch so snap a line that is 35 1 2 inches above the drip edge.
Snap a chalkline to help you align the wsu or felt.
Use a construction stapler or a hammer.
The top edge of the felt should be nailed no less than every eight inches.
Bsd 321 handout fastening schedule.
Contact roofhelp 12 24 nailing pattern for roofing felt each row of nails that are 24 on center should be approximately 12 from the outside edge of the roll.
All nails and staples should be placed on the lower half of the paper.
Check at several points to make sure the overhang is consistent.
Put fasteners at least every 8 inches.
Pay careful attention to roll the felt out smoothly avoiding wrinkles as you move across the roof.
Rafter or roof truss to top plate table and section 2308 7 5 3 10 common 316d box 410d box 43 x0 131 nails 4 3 14 gage staples 7 16 crown toenail c 7.