Pick up the roll with both hands.
Nailing pattern for roofing felt.
Shingles six roofing nails or staples per shingle.
From behind the roll reach over and nail down the top of the strip with roofing nails spaced 6 to 8 inches apart.
Be aware that roofing felt should not be walked upon prior to nailing into position.
Tab shingles need two nails on each side of the tab.
Mark the same at the other end of the roll.
Roof and wall sheathing 8 10d every 4 6 on the seams and 8 12 in the field.
Pull straighten and align the felt along the eaves.
The initial layer of felt should be installed to cover the bottom edge of the decking from edge to edge.
Be sure that there are no wrinkles.
Bitumen roof shingles may be one of the simplest roofing materials to install but nevertheless they also require specialized and exact rules on how to be fastened.
Fasten drip edge on eaves with galvanized nails and a hammer about 12 inches apart before laying roof felt.
Unroll your felt onto a flat surface.
Starting a roof with tarpaper felt.
Lightly scratch a vertical line on the surface with the rear of the blade to mark the length of your shed plus the front and rear overlaps.
Scratch a line between the two marks to create a vertical guide for your cut.
The roof decking should be completely clean and dry.
Any stray roof tacks pieces of old felt or general debris should be cleared off.
This video walks through the very basic steps for installing tarpaper felt.
Roofing felt should be installed from the bottom of the roof in horizontal layers to increase the water shedding ability of the felt.
Proper safety equipment is recommended for all installations.
Ideally the roof should be done when there is a forecast for several days without a lot of rain.
Defer putting drip edge on angled gable ends until after the felt is laid so the metal.
Nail the middle and bottom of the felt similarly.
Drywall ceiling boards require 1 drywall screws every 6 8 while wall boards require drywall screws every 6 8 on the seams and 10 12 in the field.
Roll out the felt toward the other end of the roof.
For the lower portion of the roof especially the part that overhangs the eaves and is susceptible to ice dams it is a good idea to apply self stick waterproof shingle underlayment wsu also called ice guard.
Setting the roll and then nailing off.
Running a flat bottom shovel along the roof decking will help you find any stray nails that should be pulled.
Contact roofhelp 12 24 nailing pattern for roofing felt each row of nails that are 24 on center should be approximately 12 from the outside edge of the roll.