The hardiplank is fastened to framing members such as studs.
Nails for gutters to attach to siding.
The gutters also need to slope 1 2 inch per every 10 feet towards the location of a downspout.
If the piece of siding has been nailed according to the instructions with the nails all slightly loose and all the nails are positioned in the center of their nailing fin slots you won t have a problem screwing the gutter back to the siding.
The problem should be easy to diagnose.
The primary difference between gutter nails and screws is that the latter produces a much better hold.
Gutters are supposed to catch the water running off of your roof and deflect the water away from the structure of your house.
Hardie trim recommends using a minimum 6d siding corrosion resistant nail when it s being used to attach its fascia boards to wood frame construction.
To prevent water from seeping in behind the siding where the roof intersects with the sidewall it is necessary to install kick out flashing to direct the water away from the wall and into your gutter.
When you are installing kick out flashing make sure the kick out is.
Each spring secure the nails in place and check the gutter for signs of rust.
It calls for 2 inch 16 gauge corrosion resistant finish nails only when you are attaching fascia to double sub fascia.
For this reason manufacturers design it to hang loosely on the nails rather than to be tightly nailed like wood siding.
Simply go outside grab the lower edges of a siding course and try to slide it back and forth photo 1.
If the nails are missing a gutter will pull away from the home and it can bend and crack.
Vinyl siding tends to expand and contract considerably with temperature changes.
There are gutter repair kits you can use to seal up any holes or cracks in the gutter system.
Generally an older style method the nail goes through the outside of the gutter and passes through the inside and attaches into the fascia board and rafter.
This is where the mounting strap will be attached to the vinyl siding of the house.
Nail a piece of plywood about 3 5 inches 89 mm thick along the top of the chalk line this will hold out the bottom of the first row of siding.
Attach the starter strip to the plywood but don t nail it so tightly that it will restrict the strip s movement.
This method of installing gutters is a less expensive cost for the gutter company using this method.
When they come loose the gutters can hang away from the roof which creates openings for the rainfall to leak past.